patching...
Update: Georgetown and Glover Park: Get local news delivered to your inbox. Sign up for our newsletter! »
Welcome back, Patch Blogger!

R Street Alley

Browse By

Monday, March 11, 2013

Two Alleys to Get $300k and 18-month Long Re-design

Evans, DDOT promise the R Street alleys will get their long overdue re-design this year.

Two alleys that run behind homes located on R Street, 31st Street and 32nd Street will get a complete redesign, likely using up all the the Ward 2 monies for street alleys in the process. The alleys are prone to flooding, recurring potholes, poor drainage and have been the bane of some residents' existence for upwards of 45 years. Martha Johns, whose home backs onto the R Street alley, joked that she's been "going fishing" in that alley since she first moved there 45 years ago. Though the project has in the past received promises that it would be included in the District Department of Transportation list of Ward 2 projects and that it would be budgeted for, nothing has come of it in the past, several neighbors and Advisory Neighborhood …

Saturday, February 9, 2013

Relief Promised for 'Third-world' R Street Alley

An alley off of R Street between 31st and 32nd Streets, NW is ready for an upgrade.

The District Department of Transportation has big plans for an R Street NW alley one resident described as "nearly third-world," The Georgetown Current reports.  The alley, which is off of R Street between 31st and 32nd Streets, NW, is rife with potholes. But just filling the potholes and repaving failed to improve the situation in 2011, The Georgetown Current reports. Additionally, repaving the alley would create a cascade of water, flowing from the top of the alley down into the homes at the end. “That’s not an acceptable solution to anybody. What we’re working on right now ... is a complete redesign of the alley that would include a tie-in to the stormwater system, so it would be a completely improved alley with drainage,” DDOT …

Got a Hot Tip?